|
Totes
& Containers
Consumer
electronics spare parts distribution
Reusable
containers that streamline handling and an efficient layout factor
heavily in the success of this busy 3PL
Rapid handling
is the name of the game for this busy 3PL spare parts distribution
center, which handles a variety of full and broken case items. A
high percentage of the items travel to and from the facility in
large, collapsible reusable containers. Incoming containers, with
a standard 40 by 48 footprint, are staged on the floor for picking.
Incoming pallet loads of inventory are housed on pallet racks adjacent
to the container picking area. Lift truck operators travel the aisles
picking full cartons directly into empty containers. Items that
ship in less than fullcase quantity are staged and picked in a broken
case pick-to-belt module. Picked items travel through a sortation
conveyor, where they are diverted to the appropriate ship lane and
consolidated into a container with the picked full case items. Completed
orders are staged at the dock prior to shipping.
- Combining
flow rack and shelving in the broken case pick module provides
flexibility and achieves an appropriate tradeoff in cost, storage
space requirements, and picking efficiency
- Locating
fastest-moving items in most accessible areas of pick zones further
improves picking efficiency
- Overhead
sortation conveyor reduces handling steps and frees up floor space
below
- The fact
that the number of suppliers and customers of this 3PL is relatively
small, and they are located relatively close by, facilitates the
use of reusable containers
- Use of containers
helps to maintain a neat and sanitary operation, which is critical
when handling delicate electronic components
- The fact
that the containers are collapsible allow them to be staged in
a foldedflat condition when empty, adjacent to the receiving dock
- Full containers
are staged in a bulk stacking area located next to the shipping
dock for quick delivery of orders
- Containers
can be stacked six high, helping to reduce floor space requirements
|
FACILITIES
OVERVIEW
Total warehouse space: 82,000
sq ft
Daily throughput: 400
containers
Number of SKUs: 7,000
Number of full-time employees:
75
Number of shifts: 1
Equipment budget: $3.3
million
|



NEW
AND IMPROVED ROPAK™ 4048ns
|